You have spent years on site. You have run crews, chased trades and fixed other people’s mistakes. Then your builder licence application comes back with a request for more information, or worse, a refusal, because the QBCC says your experience does not count. It is a gutting letter, and it is usually about how the experience was described, not how good the builder is. The QBCC builder licence experience rules are specific, and if you understand them before you lodge, you can avoid months of back and forth.
This guide focuses on Builder low rise, the class most first-time builders apply for.
How Many Years of QBCC Builder Licence Experience Do You Need?
The QBCC experience page says builders typically need two or four years of experience, depending on their qualifications. The QBCC’s Builder low rise experience factsheet spells it out:
- Two years of experience in the scope of the licence class if you are qualified in carpentry or bricklaying and blocklaying.
- Four years of experience in that scope for everyone else.
That experience sits on top of the technical qualification, it does not replace it. The QBCC accepts proof of technical skills such as an RTO qualification, an RTO recognition of prior learning (RPL) certificate or a qualification statement from an approved authority.
What Counts, and What the QBCC Throws Out
This is where most applications go wrong. Builder experience is about supervising and managing building work, not doing a trade well. According to the QBCC experience page, the kinds of work that count include:
- Supervising and managing trades across different building stages
- Tendering, scheduling and project management
- Stage inspections and site meetings
- Managing finances, including paying subcontractors
- Work on different building types and classes, with exact dates the QBCC can confirm
What does not count: trade-only work, projects with vague timeframes, examples the QBCC cannot verify, and jobs where you had no management or supervision role. The factsheet also excludes work done as part of an apprenticeship, training program or study, and work done under an owner builder permit. Work done before you held your technical qualification is generally not accepted either, unless you did it as an employee of a properly licensed employer.
The Stage-by-Stage Checklist Behind Builder Low Rise
The factsheet expects you to show you personally performed or supervised work across the whole build, not just one slice of it. In plain terms:
- Preliminary: lodging plans for approval and preparing contracts.
- Base stage: set-out, earthworks, footings, slab or timber base, initial services.
- Frame stage: supervising framers, services rough-in and fire separation walls in duplexes.
- Enclosed stage: trusses, roofing, windows and cladding.
- Fit-out: supervising plumbing, plastering, painting and other finishing trades.
- Practical completion: defect inspections and final approval paperwork.
- Project management: coordinating trades, quotes, invoicing, tenders and administration.
Two details catch people out. First, more than 50% of your experience must be Class 1 work (houses), although Class 10 work such as garages and sheds can count toward the total. Second, a carpenter who spent four years framing and fixing has deep experience at frame stage, but nothing at base, fit-out or completion. That gap is exactly what an assessment officer will flag.
The QBCC’s own supervision guidance explains why it cares so much: a licensed contractor is responsible for adequate supervision of the work, including quality control inspections at footings, slab, frame and final. Your experience record is your proof that you can already do that.
Referees and Evidence: Where Good Builders Get Stuck
You must complete an experience declaration, signed by you and a referee. For each example, the QBCC wants the date range, a description of the work and construction type, your employer, your supervisor and your referees. Referees should hold a licence or qualification at the same or higher level than the one you are applying for, and they must be able to confirm your experience when a QBCC assessment officer calls them.
We hear the same stories often: the builder you worked for has retired, the company folded, or the referee signs but never answers the phone. The QBCC may consider a referee in a supervisory or managerial role within the company, and if you cannot get appropriately licensed referees, you must otherwise show your documented experience is true and correct. That means plans, contracts, inspection records and invoices with your name on them.
If your experience is real but your paperwork is thin, that is a fixable problem. A QBCC Express Strategy Session maps your projects against each build stage, spots the gaps before the QBCC does, and plans the referees and evidence to close them.
Do Not Forget the Rest of the Application
Strong experience still will not carry an incomplete application. You also need to be fit and proper, provide photo identification and evidence of your business structure, and lodge an MFR report or declaration. For a company, the nominee must be an individual licensee with the relevant technical qualifications and experience. Fees depend on your licence type and maximum revenue, and they rise every 1 July, so check the current amount on the QBCC Builder low rise page before you pay.
The QBCC pages quoted here were last reviewed between 2021 and 2023, so confirm current requirements with the QBCC before you lodge.
Get It Right the First Time
Every month a builder licence sits in limbo is a month of jobs you cannot quote in your own name. Describe your experience the way the QBCC assesses it, cover every build stage, line up referees who will pick up the phone, and your application stands on its own. Book a Strategy Session to build your experience record properly, or if you just want a quick read on where you stand, start with a Free Consultation.
Frequently Asked Questions
How much experience do I need for a QBCC Builder low rise licence?
The QBCC factsheet sets two years of experience in the licence scope if you are qualified in carpentry or bricklaying and blocklaying, and four years for all other applicants.
Does my apprenticeship count toward builder experience?
No. The factsheet excludes work done as part of an apprenticeship, training program or study toward a qualification. An apprenticeship can meet the experience needs for trade classes, but not for a builder licence.
Can I use owner builder work as experience?
No. Work done under an owner builder permit is excluded from Builder low rise experience.
Who can be my referee?
Ideally a person holding a licence or qualification at the same or higher level than the licence you are applying for. The QBCC may also consider a referee in a supervisory or managerial role in the company, and referees must be able to confirm your experience if contacted.
Does all my experience have to be on houses?
More than 50% must be Class 1 work. Class 10 work can count toward the total, and some medium or open class work may be accepted where the construction method aligns with Class 1 work.